Sunday, June 7, 2009

Oh, Sh!t!!

5:44 PM--I'm back at the Great 3rd Floor Study Stairway plaster repair project, and I am an IDIOT.

And any other hard names you'd care to spit at me.

About a half hour ago, I was drilling a Few More Holes to make sure I'd get the loose plaster well secured to the lath on the sloped ceiling. But the vibration was too much for it and a big square piece about 18" square came swinging down, literally hanging on by the cattle hair along one edge.

And I am a world class GOOF, BLUNDERER, and IDIOT. Did I dash over and ease it off in one piece? Did I, o did I?

No, I did not. I thought it'd be so cool to have a photo of it for the blog! So I picked up my digital camera, turned it on, and--

When I'd barely pressed the shutter, the monster loose piece came crashing down to smash on the stairs below, along with big chunks of the plaster that'd been next to it.

I wasn't even in time to get a shot of it falling.

Crap.

I picked up the broken pieces. Maybe I can put them back together like a puzzle and glue them back up?

Or maybe I'm going to have to use what I learned at Howard Hall Farm in July 2007 and fill in the gap with real haired lime plaster.

Meanwhile, I'm waiting for the Big Wally's conditioner to work so I can at least stick down the edges of what's still up there and keep it up.


6:58 PM-- I don't think so. No. I got part of the droopy plaster back up, so it's not falling down, but overall it's no go. Most of the plaster is gapping by 3" or more, and the part I secured still has a gap of 3/8" to ½" between it and the lath. There's too many broken off plaster keys behind it that're keeping it from snugging up. And the really godawful loose parts are so warped that when I try to bring them up with the washers and screws, they bend and break. That is, if I can even reach the lath with the ends of the screws. And I don't have enough Big Wally screws and washers to secure it all anyway.

To make it worse, some of the laths are loose from the rafters and I'm not sure how to put them back in place without causing more vibration and bringing more plaster down. And it's got to be put back in place, or the plaster will still be insecure.

O vae mihi! vae mihi! Oy vey iz mir!

Okay, Kate, deep breath. The loose pieces that are still up don't look ready to fall down. Not right away, at least. Now if an overweight robin lands on the roof, all bets are off. But right now, stay cool, don't make any sudden moves, and maybe, it'll stay up till tomorrow.

So tomorrow, I shall have to get Advice. Yeah, I'm going to call the Big Wally people (aka Rory Brennan) in Vermont. And maybe a local plasterer or two whose business cards I picked up at past Home Shows. At the very least, I need to find out how and where to order the ingredients for lime plaster without having to buy enough to do an entire Victorian mansion. And help me figure out how I can get the loose but uncracked plaster farther into the room fastened back to the lath without causing a high magnitude avalanche. After that, whatever lath is exposed I can (I hope!) replaster without worrying that the old stuff will pull it away.

And it's gotta be me who does it. Spending bery menni munniez to hire a plasterer is Not. An. Option. Neither is drywall. Du nawt liek driwahl. Ai can haz nu plassturr?

And tonight in mine afflictions I will pray for grace and mercy that nothing else falls down, and give thanks that no dogs or cats were on the stairs when the plaster fell before.

And go eat supper. I'm hungry.

Is the Plaster Fixed Yet?

In fine, no.

This afternoon-- pardon me, yesterday afternoon-- I dealt with the cracks in my 2nd floor hall ceiling, wielding the wonder of Big Wally's Plaster Magic.

But judging from the fact that the drill bit (masonry, 3/16") never penetrated more than a half inch before hitting lath and the special adhesive wouldn't come out the crack, but only slid down the nozzle of the applicator tube, I guess the plaster must not have been separated from the lath after all. How that could be the case given the cracks, I cannot tell. But that's the evidence.

I put the washers up anyway, and will take them down as prescribed around 6:00 PM tomorrow. I mean, later today.













Which brings me to the sloping ceiling over the stairs to my 3rd floor study. Oh, gosh, this plaster definitely does need repair. Desperately. I had people telling me it looked about to collapse two years ago. It's a marvel it hasn't.

So after eating dinner and putting a load of laundry in the dryer and moving the ladder and laying down the drop cloths and visiting with a neighbor kid who dropped by and doing the evening rounds of my garden exhorting the plants to grow! grow! and reading what my friends are up to on Facebook and watching a Hulu.com episode of Fashion Show and having my blonde cat misjudge the edge of the plastic drop cloth and fall off the railing down to the 2nd floor (she's okay, but my pencil mug, which she also knocked down, now has a broken handle), taking my dog out to the alley for his nighttime constitutional and having a Borough cop drive up and inform me they were looking for some guy who's slinking around breaking in garages, and doing who knows what all else, I hurried, yea, rushed to get that desperate plaster repaired.

Which urgent labor must wait longer for its consummation. I've drilled holes for maybe 14 linear feet of crack, with more yet to do. But no more shall be drilled tonight: the battery in the drill needs charged. Yeah, I've got a spare battery in the basement, but enough is enough. The hair in the plaster can hold it up awhile longer.

Besides, there aren't enough screws and washers to anchor all of this. Tomorrow the ones I used downstairs will be available. I'll need every last one of them, and maybe a few more.
A couple pairs of extra hands wouldn't come amiss, either.

Saturday, June 6, 2009

A Confession

I don't want to work on the house today.

There's nothing else in particular I want to do instead, but I don't want to mess with the house.

I've noticed it lately: I'll be in the middle of a stint of work, and I realize I'm not anticipating how good it will look when it's done. No, I want to stop now.

Lately this has happened time and again. It started last month when I was digging tree roots out of my vegetable garden beds; it continues as I strip woodwork. It has nothing to do with feeling that the project is overwhelming or not ultimately worth doing. I. Just. Don't. Want. To. Work. On. It.

But I have to. The house being so torn up is competing with my need to get a full time job. I know from experience that once I go back to work, nothing will happen on the house. The two are rapidly approaching the collision point and I don't want to be destroyed in the smash.

Then, too, the North American Festival of Wales is being held here in Pittsburgh this coming Labor Day weekend. I'm on the local planning team, so of course I will attend, and my friend Ruth* from Kansas City is coming, too. She's not only coming, she's staying with me. For the sake of holy hospitality I have to get the Sow's Ear habitable before then. At least I have to have the 12' long baseboards off the floor and back onto the walls, so they don't trip her the moment she steps into my house.

And there's a lot to be done before baseboards can be reattached.

Today's project is breaking out the Big Wally's and repairing ceiling plaster. Immer zu! Immer zu! Ohne Rast und Ruh'!

Friday, June 5, 2009

Slogging On

I could say a thing or two about the siren call of the garden at this time of year, when the peas and potatoes are burgeoning and the roses are blooming and another weed is ever raising its impudent head, taunting you to pull it. No matter that I've got a five-and-a-half-year-long woodwork refinishing job languishing inside: the season is progressing and the garden wouldn't wait.

But by the beginning of this week I got the vegetable seedlings pretty much all into the ground and I've put myself on restriction against buying any more flowers to plant. The early spring bloomers I deadheaded on Tuesday, and the rose of Sharon and silver maple tree volunteers (courtesy of my neighbors on the west) are easier to pull when they're a smidgin higher. Right. So I wrested myself away and Tuesday afternoon resumed woodwork stripping for the first time since April 11th.

Dare I say I'm almost done with the biggest part of it? True, there's still the front room, but that I'm not messing with till next year sometime. But the campaign that includes the dining room, living room, 1st floor hall, stairway, and 2nd floor hall-- for that, the end is in sight.

The only thing† I have yet to strip is the casing between the 1st floor hall and the passage to the kitchen. Ironically, it is (if I remember correctly) the first piece I tackled with the heat gun, remover, and sander five years ago. It behaved so obstreperously then that I decided to take it down to work on it. It needs the belt sander and no, I don't require a warning label with big screaming lettering to tell me I shouldn't use heavy power tools over my head.

But considering what happened to the head casing when I pried the kitchen side lintel trim away this evening, maybe I'll just replace those three pieces. They're a mess, anyway.


____________________________________
†Actually, there are a couple-three other pieces I have to strip for this campaign, not originally included in the tally. But in mercy, allow me my hollow sense of pending accomplishment. Otherwise I'm liable to go back into that garden and just sit.

Saturday, May 23, 2009

Bathroom Dreames and Imaginacions

If I haven't posted lately, it's not because I don't have anything to post about, it's just that I've been too busy doing them.

Funny, it's so much easier to write about what I'm thinking of doing, and such a post this is.

My second floor bathroom needs work. That's undeniable. The bathtub is marred, discolored, and drains like an Amtrak train waiting for a freight to go by; the pedestal sink, while cute, is inconvenient and its plumbing was installed crookedly and leaks; the vinyl flooring is worn and curls at the edges; the linen cabinet is beat up, with doors that keep coming off the hinges; the tile is outdated and the wallpaper is absurd. A bathroom remodelling would be a glad and welcome event.

The other undeniable thing is that I am broke. Great credit still, but broke. I won't go into the gory details, but I do not have the funds lying around at the moment to redo my bathroom the way I'd like, or any way at all.

But it's spring and the remodelling contractor johnnies have emerged in force, attempting to drum up some work. So just for grins, I've made appointments with two of these businesses, to see what it's liable to run me to redo my bathroom, someday, maybe next year, when it might not be so laughable even to think about it.

Yesterday afternoon, then, a bloke came around from a firm I'll call First and Only Baths*.

This guy was enthusiastic, I'll give him that. I have an idea about making a cat litter box cubby under the stairs that are on the other side of the bathroom's lavatory wall, and he was so taken with it that I had difficulty in getting his attention on to what else I'd like to do. And he had no problem with my intention to do the tiling, painting, and other finish work myself, leaving the heavy lifting items to them.

But hmm, I have to wonder if this is a company I want to work with. When you've got drawings to show and the estimator still gets off on tangents about what you want to accomplish, what would you likely end up with? If you tell him you want something lined with Formica® or MDO plywood, why would he insist you should make do with stick-on shelf liner instead? If you've told him your tub drains too slowly, from what realm of fantasy would he import the idea to turn the head of the new one around so the drain line would need a greater fall from the plug hole to the soil stack? Why when you tell him repeatedly you'd need them to demolish and remove the tub, would he keep saying, "Oh, you can break it up if you want! We won't leave you with tub pieces at the top of your stairs!"

I can't imagine.

And then there was his insouciance about the floor structure as is holding the ceramic tile and clawfoot tub I want to put in. I have pictures from February when the kitchen ceiling was opened up to repair the bathroom sink plumbing. I showed them to him. It's obvious that the span between joists is too great to allow ceramic tile without sistering the joists or adding support to them somehow. But oh, no, he dismisses that; oh, it'll be fine just the way it is! They redo hundreds of bathrooms! They put ceramic tile on floors like that all the time!

I asked whether he thought the floor as it is would take the additional weight a cast iron clawfoot tub would add. "Why are you so worried about the structure?" he laughed.

"Because I don't want my bathtub in the kitchen."


He was very cheerful about simply taking up the existing vinyl flooring with its ¼" luan plywood underlayment, slamming down some HardieBacker® onto the 3/4" x 3¼" tongue-and-groove subfloor, then installing the ceramic mosaic on top of both. "Um," I ventured, "wouldn't you be putting down some exterior grade plywood first?"

"Oh, no, we wouldn't need anything like that! We've been doing these bathrooms for years!"

Yes, and I can imagine the cracked floors they've left behind. It'd be charming to think that First and Only Baths* can reverse the laws of statics to make it cheaper for me to redo my john, but me, I dunna think so.

But as Mr. Estimator burbled away, I got to thinking: How much, really, of this job can I not do? Demolition only looks formidable when you think of it overall. But if you've got a good crowbar, the tile comes out in pieces. Ditto the bad plaster (if it is bad, that is). Same with the old linen closet. The bathtub, being such a mess, probably isn't worth putting on CraigsList. Wearing suitable protection and armed with a hefty sledge hammer, I could knock the bejeebers out of it quite handily.

If I took things slowly and considered them well beforehand, I could cut and install the new cement backer board; maybe I could even sister the joists. Maybe, maybe, if I studied it out and got the right tools, I could also relocate the HVAC outlet and replace the plumbing lines for my lav and tub!

Well, no, maybe that's too fantastic.

I can imagine all that. What I can't imagine is hiring First and Only Baths* to redo my second floor bathroom.

As the kids a few years ago used to say, "In your dreams."

Thursday, May 14, 2009

Good Intentions

Oh well phooey. I meant to make a post about digging two humongous holes and hauling tons and tons of old sandy dirt out and dumping tons and tons and tons of new compost and manure and peat moss and topsoil in, not to mention digging out the stump from the arbor vitae in the first place, and so getting two more roses planted yesterday (Wednesday) evening. . .

But it took longer than I thought to download the pictures (haven't done it for awhile due to the computer being on the fritz). And then there's something I don't quite like about one of the roses. I mean, they aren't supposed to have funny markings on the leaves, are they?

I have emailed the supplier. With photos.

So there won't be a post. At least, not much of one.

Tuesday, May 5, 2009

Quick Update

Haven't done any woodwork stripping since before Easter; the garden and the yard has demanded all my attention. I'm pleased to say that a lot of shrubs and perennials I thought were goners actually came through the winter alive.

No pictures, though. My computer picked up a trojan and it's still not quite right. I don't dare post any photo files until I can make sure they're not infected.

So that's where I am at the moment!