Showing posts with label guest bedroom. Show all posts
Showing posts with label guest bedroom. Show all posts

Thursday, March 4, 2010

A Breakthrough

My mom was talking about coming up and staying with me while I recuperate from surgery the end of this month.

That means getting some heat into the guest bedroom.

Not that there's no supply duct in there; there certainly is. It's just that it's never had a grille that fit. When I only had my senior cat, it didn't matter that it was uncovered. Rhadwen has no interest in spelunking the ductwork. But my little girl-cat, Gwenith, is an intrepid duct explorer, and ever since she and her brother Huw came to live with me, I've had the guest bedroom HVAC outlet covered with a piece of screen affixed to the wall(paper) with duct tape (stupid, stupid, stupid! I actually like that paper!), with a piece of 1 x 12 board over that , and the bed pushed against the wall over that.

The room is freezing.

I've tried to install the fancy Victorian grille the POs-1 left me. Over two years ago I even butch-- I mean, notched out the 8" high baseboard to accommodate its lower rim. But I had no luck making it stay.

But now it was time to call in the heavy artillery. I phoned a local HVAC contractor on Tuesday and yesterday one of their guys came.

He was very nice. He actually pushed the grille into place and screwed in the setscrew (helps having some strength). Says after I get it painted, he'll come back and do a proper job of it for around $75 or so.

Meanwhile, it's in there! And it's been made to fit! For the first time in over fourteen years, that bedroom register has a grille on it!

I feel bad for the HVAC guy, though. I talked to my mom this morning and due to some health issues of her own, she's not going to be able to come up to be with me after all. I don't say I won't have them come install the grille properly before I go into the hospital. After all, I'll need somebody here with me for a night or two. But for my mom, I think I would have made more of an effort to get it done and not settle for Good Enough.

Tuesday, August 25, 2009

Welcoming the Guest

A big incentive for me to get a lot of work done on the house this summer is the impending arrival of a guest on the 2nd of September. She's an old friend from Kansas City who'll be staying with me for nearly a week, while we both attend the North American Festival of Wales in downtown Pittsburgh.

My dream was to get at least the 1st and second floor halls and their stairs done, with the upper walls painted and the lower walls papered and the refinished trim around and in between. And, if things had gone well, to have both sets of stairs and the 2nd floor hall wood floor refinished. And maybe the new ceramic tile on the 1st floor installed as well.

Alas, alas! It. Ain't. Gonna. Happen. What with plaster disasters in June and locating ingredients for the shellac and my pathological perfectionism with the faux finish, I am Nowhere Near That. Not at all.

So I'm taking myself in hand and concentrating on what absolutely has to be done to assure that Ruth* has clean, comfortable places to eat, sleep, and bathe, and that the obstacle course that usually encumbers the Sow's Ear is cleared away well enough so she won't break her leg manuevering between them.

The place to sleep, first. Earlier this month I finally finished repairing the guest bedroom closet back wall where the plumber attempted to get at the bathroom sink piping last February. Repainted it using the base and glaze colors I got for my kitchen five years ago. Yep, another faux finish, but combed this time, so it looks like faded denim. I think it came out rather well.

With that accomplished, I was able to reinstall the shelving and rods and put away all the closet contents that'd been lying for months on the guest bed. So once I've done a little more cleaning, the guest bedroom should be fine.

What about the bathroom? About a week and a half ago, I completed the process of repairing and repainting the plaster ceiling in the main bathroom. I'd hoped the cracks I'd been semi-ignoring over the bathtub were just in the paint or the finish layer, but nope, the whole piece of plaster was coming unkeyed and had to be dealt with. Got out the Big Wally's and secured the plaster back on . . . but for nearly a week I put off sanding the joint compound I used to fill the holes. Oh, gosh, I hate sanding! I actually preferred to live with the plastic drop cloth over the linen cabinet and the bathtub! The red metal step stool living in the bathtub! The toiletries moved into the guest bedroom against the time the sanding would actually get done!

But as I said, I screwed my courage to the sticking point and got the repaired bathroom ceiling sanded, primed, and painted by a week ago Saturday, and as soon as I figure out how to remove the newspaper I stuck to the top of the linen cabinet with the slops of the Big Wally's conditioner, the upstairs bathroom will be nearly in a condition to receive a guest.

However, I have no shower in my upstairs bath. The only one in the house is in the basement, and Ruth may want to use it. But it's been two years since I renewed the paint over the concrete shower pan, and it was worn and mildewed. Not nice for her, not nice for me, not nice for anyone. Yesterday's project, then, was to begin to rectify that. Shower pan and bathroom floor scrubbed with mildewcide, Simple Green, and then TSP; let it dry, then a coat of primer. Earlier this evening, the shower got a first coat of porch floor paint; second one goes on tomorrow, but it looks more civilized already.




While I was at it, I mounted a shelf unit given me by a neighbor who moved to Florida in July. It'll do fine.


That left another massive task for the basement. It needed cleaned. Badly. I was starting to run into things trying to get to the downstairs shower.

Besides, it had to be straightened and vacuumed before I can start shellacking my wood trim down there. So Monday evening and into the wee hours of Tuesday, that was dealt with.
Looks a little better, eh?



Now if I can only keep from obsessing about the least little wisp of cat hair I find on the stairs between now and next Wednesday . . .

Tuesday, February 17, 2009

Something More for the To-Do List

Today or tomorrow I have to send my computer processor away to be repaired. Which means for ten days to two weeks I won't be sitting in front of the monitor surfing the Internet.

The grand plan was to spend the time madly stripping woodwork. I still plan and hope to, but maybe not madly. I messed up my lower back muscles somewhat due to an intimate meeting between my car and a guardrail in early January, and they tell me at the chiropractor's office that if I do physical labor for more than a half hour at a time I'll tear them up worse.

But maybe with breaks (for the heating pad?) I can get something more done.

But as of this noon I have something else to put on my To-Do list. Last week's plumbing repairs left me with holes in my kitchen ceiling and the wall of my guest bedroom (Kitten Room!) closet. This morning, the drywall guy sent by the home warranty company came and did his work.

The plumber told me the surfaces would be left primer and paint ready. I was prepared to tackle that. But the plumber was wrong. Turns out the drywall guy's authorized only to patch the holes and apply the first coat of patching compound. Subsequent sanding and succeeding coats of joint compound are up to the homeowner.

Meaning me.

Could be worse, hey? I could be some helpless schlub with no clue about DIY or house renovation. I've got the ladder, the wet-sanding blocks, the drop cloths, and the plaster spatulas. I need to get another bucket of joint compound, but I've worked with it. I know how.

So even though I wasn't planning for this project in the next two weeks, I can do it.

As long as I don't spend more than thirty minutes at a time on it. Right.

And I learned something useful. The drywall guy used a product by USG, "Sheetrock Patching Compound," which can fill deep cavities without sagging on walls or on ceilings. It's said to be compatible with both drywall and plaster. It comes in 5-minute, 20-minute, and 40-minute workability grades. The 5-minute kind was used here today.

Hmmmm. I've got some places underneath the trim I've removed where the plaster or old patches to the plaster are in pretty bad shape. A product like this could prove to be very useful.


In other news, the concrete steps from my front walkway to the public sidewalk are crumbling so badly that I'm surprised the Borough hasn't come through and condemned them. I have to get them repaired before they give way under someone.

Of course, I have to be cute about it, even in this economy. Before I give in to the dismal reality of glaring white concrete, I want to get some bids on replacing them with stone.

Not sure exactly what kind of stone: the kind the house has as windowsills and entry stair cheekwall caps. I'm thinking it's Pennsyl- vania bluestone or else limestone that's gotten very, very dirty. The stoneyard guy who's coming Thursday afternoon to give me an estimate should be able to tell me what it is.

The tread edges would match the existing caps in thickness and cut. The risers, maybe in the same stone? Or maybe in soldier-course brick to match the house. That'd look good. All over a concrete base, of course.

That's the plan. Maybe I'll get on a computer at the public library and blog on what I find out. I do plan to update my woodwork stripping Project Tracker when I'm there, however. So keep an eye on it! 58% done now.